One technical responsibility, from concept to handover

We connect design, procurement, industrial fabrication and site execution in one controlled flow, carrying critical façade decisions from drawing to building without gaps.

TECHNIKAL

One flow. Clear control points.

Information matures progressively and every gate connects to the next, reducing discontinuity, delay and repeated work.

  1. 01Design intent
  2. 02Engineering
  3. 03Approval
  4. 04Fabrication
  5. 05Installation
  6. 06Handover
01

Pre-construction & design assist

We assess systems, interfaces, tolerances, sequence and budget before decisions become costly changes. Our technical input gives the design a clear route to construction.

02

Façade engineering

We develop the façade solution through calculations, detailing, anchors, movements, drainage and interfaces with the structure and finishes.

03

BIM, shop drawings & coordination

We organize models, shop drawings, material submittals and RFIs so every discipline works from common, controlled information.

04

Procurement

We coordinate materials, suppliers, lead times and approvals around actual production and installation needs.

05

Fabrication & assembly

We turn approved information into repeatable components and assemblies with tolerance controls and traceability.

06

Logistics & installation

We plan packing, transport, lifting and installation sequence as one integrated site system.

07

QA/QC, testing & handover

We connect ITPs, inspections, mock-ups, testing and close-out documentation so quality is demonstrated, not assumed.

Every interface has an owner. Every decision leaves a trace.

Performance-led

Decisions are tested against building-envelope requirements.

Interface-led

We prioritize the points where systems and disciplines meet.

Site-led

Engineering accounts for access, tolerances and the actual work sequence.

The right façade starts with the right technical conversation.

Talk to our team